The GDMTH tariff explained: billable demand, capacity charge and peak hours
What each item is, how it is calculated and where it appears on your bill.
Resources
Guides written by ENEGRIN engineers on tariffs, cogeneration and industrial batteries (BESS), with figures and sources, and the actual date of their last review. CFE is Mexico’s state-owned utility, and GDMTH is its time-of-use tariff for large medium-voltage consumers.
Explore a GDMTH bill
Choose a line on your bill to see what it is and what a BESS does to it.
Exact figures from the CFE bill, in MXN. The printed amount due, $8,276,294.12, includes $0.47 of prior balance.
Peak generation
kWh in the most expensive window (6–10 pm in winter, Norte division). On this bill, MXN 1.7081/kWh: 106% more than base.
What a BESS does to it
The BESS discharges here: the plant draws from the BESS, not from the grid. It is the main source of savings.
Drops · main source of savings
To see the effect on your own bill, upload it to the Ollin Simulator
What each item is, how it is calculated and where it appears on your bill.
Since April 8, 2026, Mexico’s Grid Code (Energy Regulatory Commission resolution RES/550/2021) has required a power factor between 0.97 lagging and 1.0. It is measured every five minutes and must be met at least 95% of the time each month. It applies to medium-voltage plants with contracted demand of 1 MW or more, and to all high-voltage plants.
The April 2026 rules issued by the CNE, Mexico’s energy regulator. Why a BESS at your plant does not require a storage permit if the energy is used only there. Which study CENACE (Mexico’s National Energy Control Center, the grid operator) requires and which technical standards the system must meet.
Which one fits each plant and why, in a single table.
For plants with 1 MW of demand or more. When it is cogeneration (steam, hot water or cooling from the engines' heat) and when it is on-site gas-fired generation. Why a hybrid plant with BESS makes sense, and what changed with the CNE’s April 2026 rules.
Four criteria your auditor can check before signing: two-meter measurement, a guarantee on your bill, a clear contract and continuous operation.
Under the no-investment model, nothing upfront. What sets the size in kW and kWh, what you pay each month and what is included.
The terms on your bill and in your system, each explained in one or two sentences.